Initializing...
Preview
T5-SP-1000X80

T5-SP-1000X80

T5-1000 provides full stroke force between 13,300 N (2,980 lbf) and 17,300 N (3,880 lbf) and is available in 7 stroke lengths.
SPT5-1000 operate in both hosed systems and as self contained solutions. To foot T5 gas spring series when using SPT5 side port adapter plater, use Lower Square Flange (FFC flange): SPT5-1000 use FFC-250. Available as an add-on or pre-assembled solution. All strokes are offered as a part of the HYSON Preferred Program which provides optimal delivery.

Diagram / specifications section

Preview
LMinimum Length (in)6.3
SStroke Length (in)3.15
YTotal Length (in)9.45
* For stroke lengths over 25 mm, the spring should be attached to the tool using the threaded holes in the bottom.

Item specifications

  • End Force At Full Stroke (LBF)3880
  • Force Increase By Temperature Percent Per (°F)0.17
  • Gas Volume (CuF)0.0042
  • Initial Force at max. pressure (lbf) 2200
  • Max Charging Pressure (Psi)2900
  • Max Piston Rod Velocity (FtMin)314.96
  • Max. Operating Temperature (F)176
  • Min Charging Pressure (PSI)362
  • Min. Operating Temperature (F)32
  • Recommended Max Strokes Per Minute~ 70-200
  • Weight (lb)1.65

Accessories

Similar items

T5-1000X80
T5-1000X80
T5-1000X80
T5-1000X38
T5-1000X38
T5-1000X38
T5-SP-1000X38
T5-SP-1000X38
T5-SP-1000X38
T5-1000X25
T5-1000X25
T5-1000X25
T5-1000X10
T5-1000X10
T5-1000X10